[Construction Example] System Building Low-Temperature Logistics Warehouse (Tottori Prefecture)
Introducing case studies of logistics centers that can flexibly respond to customer needs!
Based on the purpose, size, and regional environment of factories and warehouses, it is possible to select suitable roofs, walls, and structures, achieving short construction periods and low costs. Here, we introduce a case study of "system construction." The low-temperature logistics warehouse in Tottori Prefecture is divided into four sections: chilled, partial, frozen, and dry, making it a logistics center that can flexibly respond to customer needs. 【Construction Case Study】 ■ Completion Date: September 2012 ■ Location: Tottori Prefecture ■ Total Floor Area: 2,491 m² (753.53 tsubo) *For more details, please download the PDF or feel free to contact us.
- Company:川田工業 建築事業部